Amongst many other projects, the concrete patio table is finished. The surface was polished up through 800 grit, sealed with an experimental colloidal silica topping, and then coated with the soy-epoxy. I don't know how the silica densifier and epoxy will play together. We will have to wait and see.
Showing posts with label Finishing Concrete Countertops. Show all posts
Showing posts with label Finishing Concrete Countertops. Show all posts
Friday, June 4, 2010
Concrete Patio Table (Part 4. Finished)
Sunday, August 9, 2009
Finishing the White Desk
The white concrete desk was placed two weeks ago. Form were stripped after 4 or so days. Initial grouting was done at 4 days and moist cured. Initial grinding 50 and 100 grit was done at 7-days. A second thinner grout was applied with a rubber trowel. The countertop was moist cured for another 7-days until polishing. At 14 days after placing the top was polished through 1500 grit. So the full polishing scheme went 50, 100, 200, 400, 800, and 1500. I skipped 3000 grit since the sealer doesn't really stick to it. Four coats of sealer went on today. The sealer will cure for another day (it is really hot and humid in the garage right now) and will get waxed before installation.
Tuesday, April 21, 2009
Concrete Fireplace Surround Reveal
After two days of curing in the mold, under plastic, and under wet towels the forms were carefully removed. As expected there were a few places that had honeycombing and need some slurry. The larger proportions make the fireplace stand out better.
The concrete after a batch of colored slurry. The slurry was made using the same proportions of cement and pigment held together with just enough latex.
It is a little splotchy as the slurry dries. Another coat or two of slurry will be required to completely fill in all of the bug holes and honeycombing. A light grind will smooth the surface back out.