The stripped buffet mold. The flowable concrete produced a very smooth texture with very few bugholes, just a couple on the edge.
Thursday, October 8, 2009
Sunday, October 4, 2009
Placing the Fiber Optic Concrete
The fiber optic buffet mold has sat covered in the garage for a couple weeks due to some other more pressing things. Today I got back to it.
Finished gluing the fiber optics in.
Some of the first ones came loose. The ones in the mold were fine but the ones glued to the glass pieces came off. I used more hot glue on this round and everything seemed to hold better.
Here are the specs:
- 2.5:1 sand to cementitious materials,
- 5% metakaolin clay,
- 0.4 water-to-cement ratio,
- 1:1 latex admixture to water,
- 3 pcy cellulose microfibers,
- 1.5 pcy polypropylene fibers, and
- a ton of high-range water reducer
I have had problems in the past with the cellulose fibers not dispersing in mortar mixes due to the lack of coarse aggregate. The sand, water, and fibers mixed for 10 minutes before starting to mix the concrete. That seemed to get everything broken up correctly.
Thursday, September 10, 2009
Fiber Optic Concrete Progress
The mold construction for the fiber optic bar/buffet top is coming along. I taped off the bottom, drew an abstract shape, cut out the shape, and glued in crushed glass. I almost cried while making the crushed glass out of a broken Murano glass lamp from Italy. It even had the master's signature but was unsalvagable as a lamp. The bigger pieces were glued in with a drop of epoxy and the little pieces sprinkled on after spray adhesive. What is the weird frame you ask, hold tight.
Tuesday, September 8, 2009
Fiber Optic Illuminated Concrete Bar Top Project
The next concrete project is underway. This is a top for a bar/buffet. The concrete will be regular grey with crushed Murano glass and fiber optics.
The mold is pretty standard construction, 3/4" melamine with caulked edges. I only had white caulk so it blends in. The dimensions are 62"x13"x2".
The shape of this piece is pretty straightforward, however I am trying a few new techniques on this one. An abstract shape was drawn on painters tape and removed. Spray glue will be used to seed the red crushed glass in this pattern. The fiber optics will be glued to the back of the crushed glass in this section so the shape will glow through the glass.
Thursday, September 3, 2009
Sunday, August 23, 2009
Finished: White Concrete Desk Project
The white concrete desk is completed and installed. The cobalt blue and green bottles with the white sand and cement really pops.
Sunday, August 9, 2009
Finishing the White Desk
The white concrete desk was placed two weeks ago. Form were stripped after 4 or so days. Initial grouting was done at 4 days and moist cured. Initial grinding 50 and 100 grit was done at 7-days. A second thinner grout was applied with a rubber trowel. The countertop was moist cured for another 7-days until polishing. At 14 days after placing the top was polished through 1500 grit. So the full polishing scheme went 50, 100, 200, 400, 800, and 1500. I skipped 3000 grit since the sealer doesn't really stick to it. Four coats of sealer went on today. The sealer will cure for another day (it is really hot and humid in the garage right now) and will get waxed before installation.