The white concrete desk is completed and installed. The cobalt blue and green bottles with the white sand and cement really pops.
With a Ph.D. in Concrete Materials I specialize in "green" concrete, but have an affection for all things concrete. This blog will detail my exploits into all things concrete for the home.
Sunday, August 23, 2009
Sunday, August 9, 2009
Finishing the White Desk
The white concrete desk was placed two weeks ago. Form were stripped after 4 or so days. Initial grouting was done at 4 days and moist cured. Initial grinding 50 and 100 grit was done at 7-days. A second thinner grout was applied with a rubber trowel. The countertop was moist cured for another 7-days until polishing. At 14 days after placing the top was polished through 1500 grit. So the full polishing scheme went 50, 100, 200, 400, 800, and 1500. I skipped 3000 grit since the sealer doesn't really stick to it. Four coats of sealer went on today. The sealer will cure for another day (it is really hot and humid in the garage right now) and will get waxed before installation.